Funding information


Below you find an overview of our current funding projects:

- BLUE-PORT Kiel: Expansion of the intermodal connection by building a 3rd marshalling and stabling track at the station quay

- BLUE PORT Kiel - Construction of a shore power system for the simultaneous supply of ferries and cruise ships at Kiel's Ostuferhafen

- BLUE PORT Kiel - Construction of a shore power system for the simultaneous supply of ferries and cruise ships at Ostseekai and Schwedenkai

- BLUE PORT KIEL - Construction of a shore power supply at Norwegenkai

- CHAI-Joint project

- CPI: Replacement of the outdoor lighting on the Ostuferhafen harbour site with energy-efficient LED lightingung
(funding code 03K10779)

- CPI: Renewal of the interior lighting in Shed 3 (warehouse/logistics) on the Ostuferhafen site with energy-efficient LED lighting
(funding code 67K25207)

- CPI: Renewal of the outdoor lighting on the Schwedenkai site with LED lighting
(funding code 67K24651)

- D-TECH-BASE - Development of a digital test field RoRo port Kiel with two thematic test fields

- Green-Port Kiel: Port reception facilities for ship sewage at Ostseekai

- Ostuferhafen Kiel - Expansion of the maritime transport axis to the Baltic States by upgrading the Roro ramps and optimising the routing

- Ostuferhafen Kiel - Expansion by reactivating and integrating the former Ortopedia area

- Ostuferhafen Kiel - Partial demolition of the former GAG halls and creation of pre-stowage and expansion areas for RoRo ferry cargo